• bobs_monkey@lemm.ee
    link
    fedilink
    arrow-up
    2
    ·
    28 days ago

    Ah makes sense, I forget how old a lot of that infrastructure is. I do a lot of work for our local ski resort, they have a 12mw generation plant for their snowmaking system that can backfeed the utility if needed, and they’re sync setup was basically two blinking lights that you had to visually time just right to close the switch and pray you didn’t screw up lol.

    • InverseParallax@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      28 days ago

      BTW, there was money both in 2010 and 2021-2022 that was literally supposed to replace all those linkages with something less ancient, even for small things like yours.

      My understanding is the money ran out halfway or so, maybe less, and even a lot of the big stuff didn’t get done, they kept fighting on how to do it and the details, everybody wanred standardized on their system, and in the end very little actually happened.

    • InverseParallax@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      28 days ago

      That is hilarious, but also I can 100% picture it in my head, and it’s not that far off from what the big machines did until recently, and pretty sure some still do.