

Nvidia claims deployment could shrink from six months to as little as 14 days at a prepared site. That excludes the not insignificant matter of getting power, connectivity, and other site infrastructure ready first.
Pairs well with that report about Amazon having billions of dollars worth of GPUs in storage because they don’t have DCs to put them in. At least these come pre-packaged in a container you can just park somewhere!
“At 2 gigawatts, DSX can save 54 million litres of water a day,” Huang claimed, perhaps thinking of those environmental protesters.
That’s the equivalent daily water use of 375,000 people (UK figures). Obvious next question is “yes but how much water are you still using after that?”

Native English speakers might recognise it as Storm of Steel; for the unfamiliar it’s Jünger’s memoir of WWI and arguably a celebration of war.
Jünger’s an interesting character. He had different politics to the Nazis but it would be fair to call him a fascist in the period from 1918-45. After the war he revised some of his works to step away from some of his previous views, and had a big falling out with his private secretary Armin Mohler (an unrepentant fascist) over it. By the 1980s he was publicly denouncing the “ideology of war” contained in Storm of Steel.
If anyone is interested, I highly recommend the series on Mohler’s book The Conservative Revolution in Germany by the anti-fascist podcast The Empire Never Ended. First ep on YouTube. Jünger is discussed in the episode on the National Revolutionaries.